Factory interior with machinery and pipework

Factory

Everything under one roof, 40 minutes from the port

Machining, stamping, finishing, assembly and inspection all happen inside our own 12,000 m² plant in Ningbo. No sub-contracting means the tolerance on your drawing is the tolerance on your part.

Visitors are welcome. Book a visit or a live video tour through the contact page.

38
Machining centres
24
CNC lathes
12
Stamping presses
3
CMM

Quality control

Inspected at four points, documented at every one

  • Incoming material

    Spectrometer check and mill certificate match on every batch of bar, plate and coil before it enters stock.

  • First article

    Full CMM report against the drawing for the first part off every setup. Nothing runs until it passes.

  • In-process

    Operators measure critical features every 30 pieces; SPC charts on features with Cpk requirements.

  • Final inspection

    AQL 1.0 sampling (or your plan), salt-spray and hardness testing where specified, and a signed inspection report in every carton.

Compliance

Certifications and compliance

  • ISO 9001:2015

    TÜV Rheinland

    Quality management system, whole plant. Certified since 2009, audited annually.

    No.
    01 100 1234567
    2027-06
  • ISO 14001:2015

    TÜV Rheinland

    Environmental management system.

    No.
    01 104 1234567
    2027-06
  • RoHS / REACH

    Materials and finishes, declared per part. Declaration of conformity with each shipment.

  • EN 10204 3.1

    Material certificates for every batch of bar, plate and coil. On request, no charge.

  • CE marking

    Technical file support for assemblies sold in the EU.

  • Third-party inspection

    SGS · TÜV · BV

    Pre-shipment inspection arranged on request.

Certificates are available as PDF on request. Replace these with your own standards and certificate numbers.

Last 12 months

Parts shipped
1.4M
On-time delivery
98.6%
Customer PPM returns
0.12%
Containers exported
212